LOW TEMPERATURES At low temperatures it is recommended that the tools be heated before use and if it is possible use at low speed for a progressive increase in 40 P - 30 PS PS - / / 400 300 P 12 P12 MHD PS P / P PMV temperature of the machinery.
LOW TEMPERATURES At low temperatures it is recommended that the tools be heated before use and if it is possible use at low speed for a progressive increase in 40 P - 30 PS PS - / / 400 300 P 12 P12 MHD PS P / P PMV temperature of the machinery.
CONSTANT LUBIRICATION Even if the hammer is provided with a lubrication system, it is necessary to lubricate the tip of the tool to avoid 40 30 / - PS PS MHD 300 / 400 P PMV 12 / PS P P - P12 P the friction between metals.
NOT BEND Using the power of the arm of the hammer to break, or using the tool of the hammer as a lever PS 300 MHD 40 P12 / P PS P PS / 12 400 P PMV - P 30 / - sooner or later it will break. The same thing occurs when the tool leans incorrectly or when it is introduced continuously between cracks.